Infrastructure

 

I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
:  30 Acar
 
:  Yes
 
 
:  04/06/1992
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
: (Incomplete)
 
Incomplete
--
 
 
 
iii
Permanent buildings constructed
 
 
: (CBRI pattern)
iv
School building
 
 
 
: Complete
v
Dormitories
:  Boys ____390______ Nos.
   with Warden Residence__04__ Nos.
 
 
 
:  Girls _____160_____ Nos.
   with Warden Residence__04_ Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete
 
02 Shift  
vii
Principal Residence
 
 
:  _01_ No.
viii
Staff Quarters
 
 
 
 
: Type III = __16_ Nos.
  Type II = __12___ Nos.
  Type  I  = __03__ Nos.
  SP Sheds converted into Staff Qrs.:_10__ Nos.
ix
M.P. Hall
 
: Available
x
Workshop
 
: Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Column based
 
:  135000_ litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
:  _135000_ litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
: _Kirloskar _ make
:   __15_ KV
: Working
: Year of procurement
          2003
xiv
Sewage Pump
 
: __--___ H.P.
xv
Water Pump
 
 
: __7.5__ capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :  Rural Feeder
:  Incomplete
: __30__ Nos. of Poles
 
: 06to 07_ hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
:   not available
:  __02___Nos.   – Incomplete
:  __05___Nos.   – Available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: Potable,  __0_ Nos.-  working
: Potable, __01__ Nos.-  working
:  __--__ hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
:  Available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
:  --
: 26.06.2008
xxii
Whether area around transformer is fenced
:   No
xxiii
Whether open wells, if any, are covered from top
:   No  (Out Side The Vidyalaya 0.5km)
Xxiv
Works taken up under M&R fund during current year and last year:-
 
 
:
S.No
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
01
2007-08
W/Wash, C/Wash, Painting etc.
02.13
 
02
2007-08
Repairs / Replacement of Doors
0.01
 
03
2007-08
Repairs / Replacement of Sanitary fittings (W.C. Seats, traps, S.W. pipes etc.)
00.10
 
04
2007-08
Repairs/ Replacements of W/Supply fittings (pipes, valves, taps etc.)
00.27
 
05
2007-08
{Purchase of Electrical Items (Tubes, Bulbs, Chokes, Switches, etc. )
00.46
 
06
2007-08
Electrical Works
00.43
 
07
2007-08
Replacement of Broken Glasses
--
 
08
2007-08
Cleaning campus, OHT, Sep.Tank
00.04
 
09
2007-08
Other Repair Works
00.14